Wall Removal and Steel Installation
Targeted at homeowners redesigning layouts who need a certified structural opening. We manage temporary propping, dismantle brick or stud partitions, lift the steel into position, and patch the surrounding structure. You get a solid, certified opening ready for finish trades.
What is included
- ✓Floor-to-ceiling Acrow propping and strongboys
- ✓Brickwork diamond cutting to prevent vibration cracks
- ✓Engineered steel beam installation onto padstones
- ✓Double-layer fire-line plasterboard encasement
- ✓Debris removal and site clearance
- ✓Coordination with Building Control inspectors
Book an Initial Site Consultation
We will review your property details and contact you to schedule an inspection date.
Questions about this service
Can I remove a wall without an engineer's design?
No, if the wall is load-bearing, Building Control requires a structural engineer calculation package.
How long does it take to remove one standard wall?
Demolition and steel installation typically takes two to four working days, plus plaster making-good.
Will you handle the disposal of the rubble?
Yes, all masonry rubble and old timber is bagged, loaded onto skips, and cleared from the site.
Why Work With Alden Renovations
Safe demolition of dividing walls with building-control approved RSJ steel beams
No Settling Cracks
Controlled jacking and non-shrink grouting prevent upper-floor plaster from settling or cracking.
Direct Inspector Sign-Off
We arrange building control visits at the exposed-steel stage so you have paperwork in order.
Dust Management
Dust extraction saws and sealed access doorways reduce air contamination throughout your property.
Workmanship Standards and Snagging
We do not request final payment until every item on your written scope is inspected and signed off. Any defects arising from our installation work within twelve months are rectified by our team at no cost to you. Pricing & payment
Feedback From Property Owners
Alden Renovations handled our full ground floor renovation including structural wall removal and replastering. The site manager kept daily noise contained, and the finish on the joinery remains pristine after four months of family use.
Alistair M., London, GBWe booked them for a complete bathroom and kitchen overhaul. The itemised quote meant no surprise invoices, and the tiling alignment was executed with precision. A minor delay on tile supply was handled proactively.
Fiona T., Manchester, GBThe team renovated our Victorian flat, restoring cornicing and leveling uneven floor joists. Six months in, everything is solid with zero hairline cracks along the joinery lines. Direct communication throughout.
David K., Bristol, GBAll services
Discuss Your Refurbishment Project
Send us your drawings or tell us what you want to change in your home. We review your details and call you back within twenty-four hours to discuss realistic budgets.