Bathroom Renovation and Wetrooms
Built for owners dealing with failed sealants, leaking trays, or tired fixtures. We strip out back to stud or brick, apply waterproof membrane tanking, lay tiles with tight grout lines, and fit all sanitaryware. The outcome is a watertight, durable bathroom that drains properly.
What is included
- ✓Complete strip-out and skip disposal
- ✓Subfloor reinforcing for rigid tile bases
- ✓Full wet zone waterproof tanking kit application
- ✓Porcelain, ceramic, or natural stone tiling
- ✓Concealed cistern and wall-hung pan installation
- ✓Thermostatic shower valve fitting and pressure testing
Book an Initial Site Consultation
We will review your property details and contact you to schedule an inspection date.
Questions about this service
How long will our only bathroom be out of use?
We keep an active toilet functional for as long as possible, but the room is decommissioned for six to ten days.
What happens if you find rotted floor joists under the bath?
We flag the problem to you immediately, agree on timber sistering or replacement costs, and repair it before tanking.
Do you supply the tiles and taps?
You pick and purchase the finish items you prefer; we bring all waterproof boards, membranes, adhesives, and copper.
Workmanship Standards and Snagging
We do not request final payment until every item on your written scope is inspected and signed off. Any defects arising from our installation work within twelve months are rectified by our team at no cost to you. Pricing & payment
Why Work With Alden Renovations
Full bathroom strip-down, tanking, precision tiling, and sanitaryware fitting
Leak Prevention
We never tile straight onto plasterboard; tanked substrate boards protect your ceilings below.
True and Level Tiling
We use laser levels and tile levelling clips to eliminate lippage across large format tiles.
Neat Pipe Boxing
Visible pipework is hidden in purpose-built tiled boxing with discreet access panels.
All services
Feedback From Property Owners
Alden Renovations handled our full ground floor renovation including structural wall removal and replastering. The site manager kept daily noise contained, and the finish on the joinery remains pristine after four months of family use.
Alistair M., London, GBWe booked them for a complete bathroom and kitchen overhaul. The itemised quote meant no surprise invoices, and the tiling alignment was executed with precision. A minor delay on tile supply was handled proactively.
Fiona T., Manchester, GBThe team renovated our Victorian flat, restoring cornicing and leveling uneven floor joists. Six months in, everything is solid with zero hairline cracks along the joinery lines. Direct communication throughout.
David K., Bristol, GBDiscuss Your Refurbishment Project
Send us your drawings or tell us what you want to change in your home. We review your details and call you back within twenty-four hours to discuss realistic budgets.