Plastering, Skimming, and Drylining
Aimed at clients dealing with cracked lathe-and-plaster ceilings, blown render, or fresh stud walls. We strip loose material, fix tapered-edge plasterboards, and apply two coats of multi-finish plaster. You receive completely smooth surfaces ready for painting or wallpapering.
What is included
- ✓Removal of blown plaster and loose lathe
- ✓Plasterboard installation with dot-and-dab or screws
- ✓Scrim taping on all board joints to resist cracks
- ✓Two-coat Thistle multi-finish skimming
- ✓Overboarding of tired or sagging ceilings
- ✓Window reveal and corner bead installation
Book an Initial Site Consultation
We will review your property details and contact you to schedule an inspection date.
Questions about this service
How long must fresh plaster dry before painting?
Multi-finish plaster takes about four to seven days to dry to a light pink color before you apply mist coats.
Can you skim directly over old Artex?
Yes, provided the Artex is tested and confirmed free from asbestos or pre-bonded and sealed safely.
Do you plaster ceilings as well as walls?
Yes, we overboard old ceilings or skim down bare plasterboard across all room sizes.
Workmanship Standards and Snagging
We do not request final payment until every item on your written scope is inspected and signed off. Any defects arising from our installation work within twelve months are rectified by our team at no cost to you. Pricing & payment
Why Work With Alden Renovations
Flat, smooth plaster finishes over bare brickwork, stud walls, or damaged ceilings
Paint-Ready Finish
Our trowel work leaves no ridges or snags, meaning minimal sanding before your primer coat.
Acoustic and Fire Ratings
We use appropriate density soundboards and fireboards where building regs require them.
Floor Protection
We lay heavy duty floor protector sheets across all transit paths and rooms being skimmed.
Feedback From Property Owners
Alden Renovations handled our full ground floor renovation including structural wall removal and replastering. The site manager kept daily noise contained, and the finish on the joinery remains pristine after four months of family use.
Alistair M., London, GBWe booked them for a complete bathroom and kitchen overhaul. The itemised quote meant no surprise invoices, and the tiling alignment was executed with precision. A minor delay on tile supply was handled proactively.
Fiona T., Manchester, GBThe team renovated our Victorian flat, restoring cornicing and leveling uneven floor joists. Six months in, everything is solid with zero hairline cracks along the joinery lines. Direct communication throughout.
David K., Bristol, GBAll services
Discuss Your Refurbishment Project
Send us your drawings or tell us what you want to change in your home. We review your details and call you back within twenty-four hours to discuss realistic budgets.